Risk Assessment Matrix Demo

A sample electrical hazard assessment that links user input to risk selections, applies multi-axis scoring, and exports flexible reports.

Try the interactive demo

Choose your preferred language to explore how Deciris handles linked elements, customizable matrices, and conditional logic for risk assessments.

English Version

Experience the electrical hazard risk assessment matrix in English.

Open English Demo

French Version

Experience the electrical hazard risk assessment matrix in French.

Open French Demo
Linked text area and checkbox configuration inside a risk assessment matrix demo

Linked Elements for Context-Aware Responses

Invite teams to describe the tasks or work units they are assessing in a multiline text input, then link each checkbox back to that entry so risk selections stay anchored to the user’s own words.

In the electrical hazard example, supervisors document the work scope before indicating whether specific risks apply. Each checkbox inherits the task description automatically, giving you traceable answers without duplicating data entry.

Configurable multi-axis risk matrix with color-coded outcomes

Customizable Matrix with X, Y, and Z Axes

Configure probability, severity, exposure, or any other type of axis you need to mirror your corporate methodology. Each axis can be weighted and combined to calculate a final risk level.

Color rules highlight the resulting score immediately, so inspectors and reviewers see which hazards require mitigation, escalation, or acceptance at a glance.

Conditional workflow branching inside a digital risk assessment

Conditional Logic Keeps Inspections Focused

Short yes/no prompts determine whether follow-up questions display, letting non-applicable risks stay collapsed and reducing form fatigue for field teams.

When a risk is marked applicable, relevant questions appear automatically along with guidance, documentation fields, and photo uploads tailored to that scenario.

Generated PDF and DOCX documents created from a risk assessment matrix

DOCX and PDF Exports Without Manual Formatting

Push the collected answers into branded DOCX templates that lay out the narrative report, complete with the customizable matrix data and recommendations.

Repurpose the same data into a tabular appendix for auditing or executive summaries, and share a finished PDF package with stakeholders in seconds.

Ready to build smarter risk assessments?

Let’s configure your hazard library, scoring rules, and reporting outputs in Deciris so teams can capture risks once and reuse the results everywhere.